The flooring boards should remain their packaging until ready to be laid. This will protect the product from humidity and damage prior to laying, Each board should be inspected before installation to ensure that it is of acceptable quality. No claims relating to surface defects can be accepted after installation.
Before commencing work, ensure that the floor will fit under doors, as well as the skirting board.
It may be necessary to remove the skirting board whilst the floor is being laid so as to allow a suitable expansion gap around the perimeter. Determine which way the strip should be laid. For best results, the boards should be installed along the longest dimension of the room and in square rooms. The best effect is achieved if the long joints follow the path of incoming light.
Make sure the sub-floor surfaces are dry, level and sound. Most surfaces are suitable including concrete, timber flooring, particle board, vinyl or ceramic tiles and various screeds. Concrete slabs must be tested to ensure that the moisture content is acceptable. Damp slabs must be treated with a suitable moisture barrier to prevent migration of moisture to the wooden flooring.)
Whatever the sub-floor, it is recommended that a 2mm thick closed cell polyethylene underlay be used to assist with bedding of the floor and to reduce transmission of impact noise. The floor should be flat with any abrupt variations leveled out. For concrete or stone floors, a cement based leveling compound should be used and timber floors should be sanded. Old timber surfaces should also be checked for squeaking and repaired to give a sound sub-floor surface.
The floating floor system should not be applied to heated subfloors.
When gluing tongue and groove joints the adhesive should be applied in an even bead to the upper surface of the tongue, both along the side and the end of the board – as shown in the illustration. The tongue and groove joints have been machined to fit precisely together to form a seamless connection. Where boards need to be tapped into place, always use a striking block
– do not strike the board directly with a hammer.
Solid Wood Floors Laying Instructions Before Installation The flooring boards should keep in their original packaging until ready to be laid. This will prevent the product from humidity and damage before installation. Each board should be carefully examined before installation in order to make sure that it is in acceptable…
Similar post
Frequently Asked Questions on Flooring Frequently Asked Questions on FlooringWhat flooring options do you offer?At Besten Home Center, we offer a carefully selected range of premium flooring solutions to suit different homes, interiors, and lifestyles. Our most popular options include Engineered Timber Flooring, Engineered Timber Herringbone and Chevron Flooring, Hybrid…
Similar post